16 oktober 2015

 

The last week I have been busy putting blocks between the frames above the lower curve of the hull. This weekend Klaas is comming to visit me. He will certainly monitor everything;-)

 

I sanded this morning everything checked everything again. 

_______________
Regards,

Henk

 

 

11 oktober 2015

 

This morning I sanded the rafters between the lower two blocks. There is now a smooth line.

 

_______________
Regards,

Henk

 

 

10 oktober 2015

 

In preparing section M,  I'm found out that it is now no longer possible to make the frames in a production line of 4.The frames are now different.  The sizes of the frames differ too much from each other

 _______________
Regards,

Henk

 

 

Foto van Alexandru's romp

De afstandblokken zijn linksboven zichtbaar

 

8 oktober 2015

 

The frames of section K are ready. Time to put them back in place on the keel.  This weekend I first prepare some wood for the top kiel Board and in addition some extra wood for soe blocks. 

_______________
Regards,

Henk

 

 

4 oktober 2015

 

Well ... he made it yesterday. I do not know who was more nervous ... Déon or his mother. He has done a great job and now has his A diploma. Grandma walked proudly around in the pool .... on to the B certificate.

After frames 41 and 43 is also frame 40 ready. 

 
_______________
Regards,

Henk

 

 

3 oktober 2015

 

The last evenings I have been busy to cut out the frames. This morning I sawn all the parts for the rframes.  The parts of frame 41 and 43 are almost ready and the first components are already glued.

 

The rest comes tomorrow. Grandpa and Grandma are goning this afternoon to our oldest grandson Déon. He may take the exam for his swimming certificate A

 ________________
Regards,

Henk

 

 

30 september 2015

 

The frames of section H (44 t / m 47) are ready. Last night I have sanded them and put the frames on the keel. There are nouw 32 frames ready, still 117 frames to go. Although there is still a lot of work to do, it is nice work.

 

Next thee frames of Section K (spanning 40 t / m 43).

________________
Regards,

Henk

 

 

25 september 2015

 

In rthe ecent days, I have milled the frames and glued them together. The half-frames 44 and 47 are ready and can be provided with pins. First I finisch frames 45 and 46. We are back on track.

 

________________
Regard,

Henk

 

 

20 september 2015

 

This morning I started with the cutting of the parts. Because everything was going fine, I sawn  all the parts of all four frames of this section.

Then I started milling the surfaces. I must honestly say that the frame 'Type 3' is difficult to make. Although the basis of this type of frame is the same as that of the first type, these four parts is more than that of the type 1. This type has a total of 15 parts. The  

It took a while, but the lower part of the two Type 3 frames of section H are ready. Next week I prepare the rest and glue everything together.

 ________________
Regard,

Henk